Neff Yacht Sales / Used 44 foot LUHRS 44 Convertible Sport Fisherman - Change Order

LUHRS 44 Convertible

Change Order

2003 • 44' (13.41 m) • Sport Fisherman
United States

$195,000 USD

This 2003 44' Luhrs Convertible boasts an impressive blend of style, comfort, and performance. With her Custom Tuna Tower, Cummins QSM-11 Engines, and Extensively Upgraded Electronics she is a proven fish raiser.

  • Upgraded Garmin Electronics Package (2018)
  • Recent Bottom Job w/New Zincs Completed (2018)
  • Propspeed on all Running Gear (2018)
  • Complete Compound & Wax of Topsides/Hullsides (2018)

Read more...

Vessel Information

Builder: LUHRS
Model: 44 Convertible
Model Year: 2003
Type: MotorBoat
Category: Sport Fisherman
Sub Category: Convertible
Condition: Used

LOA: 44' (13.41 m)
Beam Feet: 0' (0.00 m)
Draft Feet: 0' (0.00 m)
Engine Info: 635 HP, Twin, Inboard, Diesel, Cummins
Sleeps: 6
Staterooms: 2

Location: Freeport, United States
City: Freeport
Country: United States

Salon

Air-conditioning (2 units)

AM/FM stereo system

Samsung DVD/Blueray player

42" LG flat screen TV

Entertainment console w/bottle storage

Satellite TV receiver

Icom M-502 VHF radio

Leather L-shaped lounges to port and starboard

Overhead LED lighting throughout

Surround sound system

Overhead recessed lighted rod storage compartment

Teak & holly inlaid flooring throughout

Satin finished cherry wood interior

Central Vacuum system

Main systems breaker panel to port at entryway

Carbon Monoxide detectors

Galley

L-shaped synthetic stone countertop w/sink & faucet

Lower cabinetry with storage drawers

Kenyon 3-burner electric cooktop

Frigidaire microwave

Overhead storage cabinets

Dual under-counter refrigerators/freezers

Master Stateroom

Island queen berth

Cherry wood interior and cabinetry throughout

Surround sound

Overhead skylight with Seabreeze blackout shade

Reading lights

Overhead LED lighting

Storage drawers at foot of berth

Cedar lined hanging locker

32" Samsung flat screen TV w/Blueray player

Sony AM/FM stereo receiver

Port & Starboard bulkhead mounted overhead storage cabinets

Companionway

Washer/dryer located in companionway closet

Head

Vanity with synthetic stone countertop w/sink & faucet

Vacu-flush head w/macerator

Overhead LED lighting

Storage cabinet

Blower fan

Sliding dividing door that separates head compartment from shower compartment

Shower enclosure

Vanity in shower compartment w/synthetic countertop, sink, & faucet

Storage cabinets below vanity

Mirrored medicine cabinet

Guest Stateroom

Over/under bunk arrangement

Cedar lined hanging locker

Overhead skylight with Seabreeze blackout shade

Reading lights

19" flat screen TV w/Blueray

LED lighting throughout

Helm

(Qty. 3)Garmin GPS Map 1242 xsv chartplotter displays w/ SideVu/ClearVu/DownVu CHIRP (New 2018)

Adjustable polished stainless steel helm wheel

Cummins digital engine displays

Dual lever engine controls

Simrad autopilot controls

ACR directional spotlight controls

Engine start/stop switches

Trim tab controls

Fuel level gauge

Battery parallel switch

Horn

Accessory toggle switches

Windlass controls

Ritchie SS2000 Compass (New 2018)

Canvas helm cover (New 2018)

12v receptacle

Icom M604 VHF radio

Furuno GP-33 autopilot

Fusion MS-UD650 head unit

Flybridge

3-sided isinglass enclosure

JBL Audio speakers throughout

Overhead lighting

Padded bench seating located forward of helm console

(qty. 2) Captain's chairs with folding bolsters

Padded corner bench seating located to aft port side of helm

Aluminum grab rail w/ 6-rod rocket launcher

Tuna Tower

Garmin 4208 GPS Map

Engine start/stop switches

Trim tab controls

Engine controls

KVH Trac-vision satellite TV receiver

Electronics

(Qty. 3)Garmin GPS Map 1242 xsv chartplotter displays(New 2018)

GMR 424 xHD2 Open Array Radar (New 2018)

CV51M-THP (Pair)Fairing Block Transducers SideVu/ClearVu/DownVu CHIRP (New 2018)

Furuno GP-33 autopilot

Fusion MS-UD650 head unit

KVH Trac-vision satellite TV receiver

Electrical System

120/240 volt 50 amp shore power connections

GFCI protection throughout

Internal bonding system with zinc anode

Mechanical Equipment

Seastar hydraulic steering system with new ram installed in 2018

Automatic shower sump pump

Bilge pumps w/float switches

Bronze thru-hulls with seacocks

Stainless steel thru-hulls above water line

Engine alarm system

Electronic engine controls w/synchronizer

Engine Room

Twin Cummins QSM 11 Engines (850 HR's since MOH)

Onan e-QD 13.5 kW diesel generator

Dolphin battery charger

(qty. 3) Reverse cycle air-conditioning units

Battery switches

Watermaker

Dripless shaft logs w/ PSS dripless packing glands (New 2018)

Fire suppression system

Racor fuel/water separators

Hot water heater (20 gallons)

Internal sea strainers

Oil X-Change-R system

Automatic bilge pumps

Tool box

(qty. 2) IR cameras

Cockpit

Engine room access hatch

Lazarette access hatch

Fish box with self-bailing overboard drain

Courtesy lights

Fresh/raw water washdowns

Flush mounted gunnel rod-holders

60 gallon livewell

Molded fiberglass ice chest

Bait-rigging station w/tackle drawers, sink & freshwater faucet

Transom door

(qty. 2) Electric reel outlets

Bait freezer

(qty. 2) JL Audio tower speakers

Infrared cameras

Underwater lights (multi-color LED)

Decks

Windlass w/anchor and rode

Bow pulpit w/anchor roller

Frameless tinted windows

Rupp double spreader outriggers

Hull

Hydraulic trim tabs

Recent bottom job(April 2018)

New zincs (April 2018)

Prop speed applied to all running gear (April 2018)

Exclusions

Owner's personal effects, fishing gear, and tools.

About Us

So you have made the decision to buy a yacht. Now it's time to make an even bigger decision and choose the right brokerage. Whether you are moving up in size, moving down in size or a first time boat buyer it is important to get the right support. Buying a vessel is a big decision, usually a $100,000 + decision. So having trust and confidence in your yacht broker is key.

Contact Us