Available
2028 Aegean Yacht  — photo 1
$23.50M

2028 Aegean Yacht

Motor Yachts·
Florida
View Aegean Yacht Yachts for Sale
$23.50M
USD · Asking Price
215 ft
Length
2028
Year
Motor Yachts
Type
Florida
Location

About This Vessel

measures 215 ft, and is located in Florida, powered by 2x MTU 16V4000M63R 0.00HP.

It is offered as a convenience by this broker/dealer to its clients and is

NAVEL ARCHITECTURE & DESIGN WORKS

Naval Architecture Most of the drawings and calculations have been completed. The remaining and required shop drawings along with 3D drawings (including piping, penetrations, foundations etc. are necessary to complete the construction. Additional Class Drawings, A type remarks and others requested by class society will also be needed. Please see Class Drawing and remark reports below; Detail Design & Shop Drawings Many shop drawings and detailed design works are still needed. Exterior & Interior Design The conceptual design works for both interiors and exteriors have been completed by Red Design. The shop drawings and detailed drawings will be done by the Furniture Maker.

HULL, SUPERSTRUCTURE, DECK CONSTRUCTION AND OUTFITTINGS

Steel hull construction completed and accepted by Class surveyors (RINA), including ndt and ultrasound checks and tank tests, only several outfitting hot works remaining on hull. The construction of the aluminum superstructure including hardtop, has been completed.

STEEL AND ALUMINUM OUTFITTING

All manholes have been manufactured and installed. All soft patches for main engines, gensets, bow thruster, etc. have been produced and installed. All tank fittings are installed, and pressure tests of all tanks have been performed and accepted by Class Surveyor.All watertight doors under main deck purchased and welded. All porthole frames have been manufactured and welded.A60 doors at the garage area are installed.All freeing ports have been installed. The steel and aluminum surfaces on superstructure sides in the windows areas determined and constructedAll hatches have been purchased and the hot works for the openings are completed.The elevator box, its platform & the main stairs have been constructed. Additionally, the steel boxes, for the side boarding ladders are also constructed.Anti – rust treatment necessary at certain locations.The aluminum structure construction of the following areas has been completed.Main & Upper deck seating groups, Pool & pool area,Storage places front of the Wheelhouse,Store places on the upper deck aft bulwarks,Wing stations Fresh Air Units’ boxesStainless steel windlass trays, chain pipes and anchor plates have been produced and installed. The installation of additional plates around anchor plates has started. Stainless steel fairleads have been completed and installed in the bow area and amidship.Dumbwaiter cut-out has been completed on both decks.The construction of additional frame supports under gen-sets has been completed in accordance with Notilus Design's Drawings.Exhaust outlets for engines and gensets have been produced and welded onto the shell, ultrasound checks have been performed and approved by RINAThe installations of wheelhouse floor gratings are completed.The foundation for the SOLAS crane has been welded on deck.A60 doors for the guest areas have been purchased, stored in shed and hot works for the door openings are completed.Stern, Tender garage & jet-ski garage doors have arrived, and the required checks have been conducted with the Surveyor and Manufacturer. The drawing for additional supports has been done and approved by RINA. The installations of these doors including tender garage, jet ski garage doors and the stern door are now complete.Pantograph doors have been ordered from Bofor and the hot works of their openings have been completed. Some of the other remaining outfitting works are; Equipment FoundationsGarage & Beach Drainage SystemCable Tray Lines and penetrations for both High and Low VoltageGalley Ventilation UpdatesRemaining Scuppers & Storage DrainsPool Piping System WorksVentilation Grill StructuresShip's Name ArrangementFilling StationShore Connection BoxLifebuoy ArrangementTank deck area, technical room and engine room floor foundations and platesAll A type remarks related worksTender Garage & Jetski Garage crane foundation

PAINTING AND FAIRING

All surfaces must be checked and painted with anti – rust primer.All tanks have been sandblasted. Fresh water tanks, grey and black water tanks, bilge and sludge tanks have been epoxy painted according to the instructions of the paint manufacturer, TEKNOMARIN.Additionally, all steel areas inside the hull have been sandblasted and painted with epoxy primer to a 200 microns dry film thickness also following the instructions of TEKNOMARIN.Sandblasting and priming works on the outside hull surfaces including under water area, above water line area, main deck (all steel parts) and aluminum areas on the superstructure, upper deck & sun decks have all been finished.Epoxy filler application to fair the surfaces has been started. Nearly, all of the hull, excluding, aft area starting behind the ER fwd bulkhead to the stern are filled. The same job on the superstructure has also been completed. FillerFiller applied on the openings of the pantograph doors area to facilitate work on the templates. The manufacturing of the templates is completed, and they have been sent to the manufacturer; they are under production

HEAT, VIBRATION AND SOUND INSULATION

U profile installation works, for sandwich panel walls on tank deck area, have been completed. Rockwool insulation works commenced prior to the panel installation. Insulation pins have been stud welded on all steel areas. Rockwool insulation sheets have been installed on some areas on the tank deck and lower deck.Bi-metal insulation pins stud welding works inside both galleys are finished, and the process has started on the surfaces of the galley walls.All aluminum interior areas have been sandblasted, and insulation pin stud welding has been installed on these surfaces. All these areas have already been painted. All paint work must be inspected and repainted where necessary.A60 insulation has been completed in ECR and the switchboard is installedWall panel frames have been manufactured, and the panels are temporarily installed. Some penetration drawings are needed to complete this work on ECRDamping plates have been applied on engine room front bulkhead in lower deck and whole main salon floor (engine room ceiling) and air ventilation channel on Main Deck and bow thruster tunnel and around.

INTERIOR CONSTRUCTION, FURNITURE AND ACCESSORIES

Crew cabin partitions and raw wood furniture construction works are completed on the lower Deck. All this furniture has been dismantled & stored. But, since a long time has passed, the bare wood and plywood furniture have deformed and will need to be remade. The dunnage material for lower deck and main deck floor has been imported and stored in the shipyard along with some ply-wood and bare partitions.

GENERAL MANUFACTERED OUTFITTINGS

Deck Doors & Locker Doors All deck doors have been purchased. However the pantograph doors have not yet been delivered from Bofor. The inox doors, purchased from Tecnoinox and the hinged doors for the upper deck and main deck, purchased from Cosmo, have not been installed. Glasses Need to be purchased. Deck Hatches All purchased except new requirements for stern door access hatches. These two need to be ordered. Watertight / Fire Tight Doors Interior fire doors purchased from AP Marine have not been installed.Frames for watertight doors on bulkheads have been installed and hinged watertight doors purchased from Cosmo are installed. Transom / Shell Doors All shell door frames have been welded with doors onto the hull, but the installation works, including hydraulic and electric components have not started yet. Elevator One passenger lift ordered from Bertazzoni / Italy (Needs confirmation) Dumbwaiter One dumbwaiter ordered from Bertazzoni / Italy (Needs confirmation) Windlass Two DATA DZC 5000-2 Electrical Windlasses are stored at the Shipyard. Stainless Steel Windlass base was done. Chain Roller, Stopper 2 x Stored at the Shipyard. Mooring Capstan Two DATA DHC 7000 Electrical Capstans are stored in the Shipyard.Their foundations have been completed on board. Anchor & Chain 18 pieces of 24mm Chains (each 27.5m), 18 pieces of 24mm Grade3 connection shackles, 2 pieces of anchor shackles and Swivel allGalvanized and Grade3 and two 520 kgs HHP Stainless Steel Anchors are stored in the Shipyard. Cranes Need to be purchased. Passarelle (Gangway) Motomar hydraulic gangway has been installed on board. But the installation of hpu, hydraulic and electric works have not started. Side Boarding Ladders Two Motomar hydraulic gangways are purchased, %70 of the installation of the port side Ladder has been completed, starboard side not started. Installation of hpu, hydraulic and electric works have not been started. Windlass Seats Welded on place. Mooring Bollards Purchased and welded on places. Fairleads Purchased and welded on places. Dorades, Cowl Vents, Mushroom Vents No action has been taken. Ventilation grills / Dehumidifiers No action has been taken. Guard Rails No action has been taken. Pulpit and Stern Rails No action has been taken. Handrails No action has been taken. Anchor Plate Started but not completed. Chain Locker Only foundations were welded. Mooring Lines Need to be purchased Fenders Need to be purchased Horn System Kahlenberg T-3A horn system has been purchased and is stored in the Shipyard. Flag Pole & Halyards Only the pole base has been welded. Deck Jacuzzi / Pool Ordered from Water and Wellness Co. Italy Wipers 8 pieces Exalto wipers with wipers and washing jet nozzles have been purchased. Helmsman Seat Need to be purchased. Sign Writings No action has been taken. Diving Compressor No action has been taken. Dinghy and Outboards No action has been taken. Jet Skis, Sport & Diving Equipment, toys No action has been taken. Draft Marks No action has been taken. Freeboard Marks No action has been taken. Boat Cradle No action has been taken. Telescopic Mast Purchased from AMS, stored in the Shipyard. Foundation and deck penetration has been done. Cathodic protection Cathelco Antifouling & ICCP system purchased and stored in the shipyard. Electrode flanges are installed to water strainer boxes and cell covers are installed on the hull bottom.

ENGINE ROOM, PROPULSION AND CONTROL SYSTEMS

Engines 2 x MTU 16V4000M63R Engines are on foundations, have not been fixed yet, final arrangement should be done at sea. Last preservation works has been done for both main engines and gear boxes by MTU service on 25.08.2021. Need report from MTU. Propeller 2x Fixed pitch 1800 mm diameter 5 blade Propellers were purchased from Otto Piening stored at the yard. Shaft System Otto Piening stainless steel shafts and their system including stern tubes, aft shaft struts, net cutter and earthing devices were purchased.Stern Tubes and Aft Shaft Struts has been installed and welded. NDT performed and approved by Class surveyor.Bearings on stern tubes (both inner and outer) and aft struts have been installed and ready for chock fast operation. Engine Exhaust System Purchased from Soundown. Installed on board but some parts were removed for other hotworks in the ER. Exhaust insulation No action has been taken. Transmission 2xZF 9311 i:4.522 gear boxes were purchased with MTU Engines. Gensets 2x420 kW + 1x250 kW + 1x120 kW (as emergency) Liag– Lindenberg gensets have been installed on board. Genset company does not exist anymore. Gensets preservation works were done on 12 – 14.10.2021. Genset Exhaust System Purchased from Soundown with Zenoro Sooth filters for service gensets. Installed on board, but some parts were removed for other hotworks in the ER. Hydraulic Steering System DATA DDS 2x1500 Electrohydraulic Steering system was purchased.Steering Gear installation is done on board. Rudder Blades Rudder tubes have been installed and welded. Twin rudder shafts and blades have been installed. Bow Thruster Schottel 200 kW Electrical thruster has been installed. Protection grills are also produced. Stabilizer 4 fins Quantum zero speed stabilizer welding bushings have been installed on board. Hull Units also dismantled and re-assembled in compartment & HP Units are taken to the boat. Installation needs to be completed. Guard & Hand Rails No action has been taken. Floors No action has been taken. Drip Pans No action has been taken. Workbench No action has been taken.

PUMPS, FANS, BOILERS AND WATER SYSTEMS

Fire Pump 1x Azcue CA-65/20 stored in the Shipyard. Emergency Fire & Bilge Pump 1x Azcue CA-65/20 stored in the Shipyard. Main Bilge Pump 1x Azcue CA-80/15A stored in the Shipyard. Direct Bilge Pump 1x Azcue CA-50/7A stored in the Shipyard. Bilge Alarm Switch Need to be purchased. Submersible Bilge Pump Need to be purchased. Bilge Pump Automatic Start Switches Need to be purchased. Deck Wash Pump 1x Azcue SP-MO-31/20 stored in the Shipyard. Fresh Water Pressure Pump 2x Azcue SP-MR-41/30 stored in the Shipyard. Including system control panel with frequency control panel. Pressure Tank 1x Azcue HMT6/8-H24L stored in the Shipyard. Black Water Discharge Pump 1x Azcue CA-50/4A stored in the Shipyard. Grey Water Discharge Pump 1x Azcue CA-50/4A stored in the Shipyard. Fuel Transfer Pump 2x Azcue BT-IL52D4-F stored in the Shipyard. Fuel Hand Pump Need to purchase. Lubrication Oil Pump 1x Azcue BT-HM32D-F stored in the Shipyard. Dirty Oil Pump 1x Azcue BT-HM32D4 stored in the Shipyard. Hot Water Circulation Pump Need to be purchased. Sea Water Cooling Pumps 1x Azcue LN-40/125 for ER Cooler, 1x Azcue CP-25/130 for EC Unit Cooler and 1x Azcue CA-40/1B for EDG Exhaust Cooler stored in the Shipyard. Engine Room Fans Including H/H package, stored in the Shipyard Fire Dampers for Fans Including H/H package, stored in the Shipyard Boilers Need to be purchased. Air Condition and Ventilation UnitsCentral Chiller Unit of AC system and fresh air & exhaust air system ordered to Heinen & Hopman, stored in the Shipyard. Fresh Water Maker Two 800 lt/h capacity, each, Tecnicomar S 3/44 units are stored in the Shipyard. UV Filter 1x Tecnicomar UV20/SD/EPM stored in the Shipyard. Sand Filter 2x TCC/1 remineralising filters stored in the Shipyard. Strainer 2x TFD filters stored in the Shipyard. Sewage Treatment System 14.500 lt/day capacity Tecnicomar Ecomar 145 S unit stored onboard.Upgrade kits also stored in the shipyard. Toilet System Vacuum System order cancelled by Jets. Fuel Separators Alfa Laval MAB 103 stored in the Shipyard Bilge Separator RWO OWS-COM 0.5 stored in the Shipyard Air Compressor Need to be purchased.

TANKS, PIPING AND PLUMBING

Bilge & Fire System 65% of metal pipe laying work has been done. No valves installed or purchased. Fresh & Hot Water System 80% of pipe laying in crew area completed, there is no work done in other areas. Black & Grey Water System Only tank fittings and tank connection and some part of PPRC piping in the crew area have been done. Seawater System Only main seachest collector has been done. Air Conditioning System Air condition cold water piping also started on tank deck and lower deck. Tank Ventilation System 60% of metal pipe laying work has been done. No valves installed or purchased. Air Ventilation System Fresh air and exhaust air spiro piping works already started and all lines installed on tank deck, lower deck main and upper deck.MD guest area Exhaust units are installed on place. Planum boxes and distribution lines temporary installations are done.They will be aligned and permanently installed. Lube Oil System No action has been taken. Air Pressure System No action has been taken. Deck Scuppers and Drainage System 60% of metal pipe laying work has been done. Tank Level Gauges No action has been taken. Hydraulic Systems No action has been taken.

ELECTRICAL

Cable Penetration and Trays 70% of the High Voltage cable penetrations and Trays are completed. Due to limited space, caused by the ceiling heights in the guest areas, additional cable trays have been purchased and new & wider cable trays are being installed to accommodate the ceiling heights. However, no action has been taken for Low Voltage cable penetrations and trays. Cable Pulling Cable pulling has been started at the crew area and on tank deck. Switchboards (AC/DC/EMG) Main AC/DC & Emergency Switchboards have been produced. Main switchboards are installed in ECR. For the distribution Switchboards, only the cabinet of the crew area distribution board has been purchased and installed in its place. No any action has been taken for the others. Transformers Service & Emergency Transformers, Galley & Laundry Transformer and Shore Power Transformer have been purchased. Only Shore power transformer has been installed on board. Start Panels (Pumps, Fans, Nav Lights, etc) No action has been taken. Batteries The batteries for gensets which came with the units have all expired and need to be replaced. No action has been taken for the others. Battery Insulator No action taken. Battery Chargers Chargers for the gensets’ batteries came with the units. No action has been taken for the others. Battery Master Switch No action has been taken. Inverter No action has been taken. Converter No action has been taken. Electronic Cables No action has been taken. Shore Cable, Sockets No action has been taken. Switches & Plugs No action has been taken. Dashboards No action has been taken. Interior Lights Ordered from Cantalupi. Exterior Lights Ordered from Neo Light. Pay & acquire the goods. Decorative Lights No action has been taken. Emergency Lights No action has been taken. Underwater Lights 28 pieces three colored LED underwater lights along with their DMX drivers have been purchased and are currently stored in the Shipyard; the installation of the flanges has been completed. Navigation Lights No action has been taken. Search Lights 2x Sanshin HRX-150 with remote control panel have been purchased and stored in the Shipyard. Dimmer Modules No action has been taken. ER, Bilge and Technical Area Lights No action has been taken. Materials used inside switchboards No action has been taken. General Electric materials No action has been taken. Other Consumables No action has been taken. Alarm Monitoring System Ordered from ECR Power Management System (Paralleling System) System module has been installed in the Main Switchboard. No action taken for other works. Electric Plans Some plans have been drawn up by Can Makina Elektrik Company and approved by the Class. Need to make agreement for the remaining plans and calculations. Subcontractor Delmar Marin Elektrik Company has started but need to make a new agreement.

MAST

Aluminum mast construction has been completed and stored in the Shipyard.

SAFETY SYSTEMS AND EQUIPMENT

ER Fixed Fire Fighting System Ordered watermist system from Ultrafog/M-Fire Springler / Water Mist System Ordered watermist system from Ultrafog/M-Fire. Ultrafog high pressure fire-fighting system’s piping works have been started and main lines have been installed on tank deck and lower deck. Updated drawings are pending from Ultrafog to re-start piping on the other decks. Fire Alarm and Monitoring System Ordered from M-Fire Mobile Fire Extinguishing Equipment Ordered from M-Fire Fire Hydrants, hoses and Nozzles Ordered from M-Fire Liferafts No action has been taken. Hydrostatic Release No action has been taken. Life Buoys No action has been taken. Life Jackets No action has been taken. Line Throwing Gun No action has been taken. Man Overboard No action has been taken. Aldis No action has been taken. Charts No action has been taken. Books No action has been taken. Immersion Suits No action has been taken. Medical Supplies No action has been taken. Harnes eyes and Jackstays No action has been taken. Fog Horn No action has been taken. Solas Posters No action has been taken. IMO Signs No action has been taken. Radar Reflector No action has been taken. Emergency Escape Ladder No action has been taken. Pyrotecnics No action has been taken. Epirb and Sart No action has been taken. Klinometer No action has been taken. Binocular No action has been taken.

ELECTRONICS AND NAVIGATION

This system has been ordered from Promar including S Band and X Band Radars, Synapsis integrated Bridge system with 5 pcs 26” monitors, Autopilot System, Gyro & Magnetic Compass System, BNWAS System, D-GPS Navigator, AIS, Wind, VHF & MF/HP Radiotelephones, Inmarsat, Navtex, GMDSS Safet Equipment, Portable VHFs, Echosounder, Speed Log, Intercom System, Public Announce System, TVSAT and VSAT Systems, Fleet Broadband and their cables and components.No action has been taken for cable pulling of this system.

HI FI AND TV SYSTEMS

This system has been ordered from Lotusconcept including TVs and Satellite Receivers, Loudspeakers and Subwoofers, Av receivers and amplifiers, Crestron equipment, Apple and Launchport Products, Network System, CCTV System, PABX Systems and their cables and components.Cable pulling of the system is also ordered from this the company.

AWNING AND UPHOLSTSERY

Sun Awning System has been ordered from Reckman covering Main Deck, Upper Deck Aft and Sun Deck Aft. Negotiate with Reckman, pay and acquire goods.Their deck sockets have arrived and welded on their places onboard.

Vessel Overview

Year2028
MakeAegean Yacht
Vessel NameAEGEAN 66M
CategoryMotor Yachts
ConditionUsed
BuilderAegean Yacht
Hull MaterialSteel
Fuel TypeDiesel

Dimensions

Length Overall215 ft
Beam39 ft
Max Draft11 ft
Gross Tonnage1,324

Performance & Capacity

Cruise Speed11 kts
Range5,000 NMI
Fuel Capacity50,193 gal
Fresh Water15,850 gal

Engines & Mechanical

Engine Count2
Engine 1 MakeMTU
Engine 1 Model16V4000M63R
Engine 1 Power0.00 HP
Engine 1 FuelDiesel
Engine 2 MakeMTU
Engine 2 Model16V4000M63R
Engine 2 Power0.00 HP
Engine 2 FuelDiesel

Accommodations

Guest Cabins8
Sleeps16
Crew Cabins11
Crew Sleeps19

We Will Assist You With

Full sea trial arranged
Independent marine survey
Title search & documentation
Closing coordination
Financing introductions available
Insurance referrals available

Your Broker

Jared Neff — Neff Yacht Sales Broker
Jared Neff
Yacht Broker · 20+ Years Experience

Inquire About This Vessel

We respond to every inquiry within one business day.

No pressure. No obligation. Just expertise.

Back to All Listings

Yacht Access is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Northrop and Johnson. not intended to convey direct representation of a particular vessel